Rail network operatorsTrack maintenance contractorsPrivate sidingsMines

    Railway Track Inspection Checklist (Plain Line, Points and Crossings)

    A walking or trolley inspection of a length of track, plain line and points, recorded kilometre by kilometre. The defect topics follow the track and civil precursors that South African operators report to the Railway Safety Regulator, so a defect found on foot is recorded in the terms the quarterly report uses.

    On the interval your track maintenance plan sets, and after heavy rain, a derailment or reported damage · 27 checks · free printable PDF

    Legal basis checked 26 October 2026

    A track worker in a hi-vis jacket walking between the rails of a railway line

    What the checklist covers

    Rail and joints

    • No broken or cracked railsPhoto
    • Rail head wear, corrugation and surface defects within your limits
    • Welds and insulated joints sound; no dipped or battered joints
    • Fishplates and bolts present and tight
    • No rail creep, buckle or kick-outPhoto

    Sleepers, fastenings and ballast

    • Sleepers sound: no cracked, rotten or hanging sleepers
    • Fastenings and clips present and tight; no missing pads
    • Ballast shoulder and crib full; no fouled ballast or mud spots

    Track geometry

    • Gauge within limits; no gauge widening
    • Cant and twist within limits
    • Line and level: no slacks or kinksPhoto

    Points and crossings

    • Switch blades fit the stock rail; no chipped or damaged blades
    • Stretcher bars, slide chairs and check rails secure
    • Crossing nose and wing rails free of cracks and excessive wearPhoto
    • Locking and detection working (checked with the signal maintainer where your rules require)

    Drainage, earthworks and structures

    • Drains, culverts and cess clear; no standing water or washawaysPhoto
    • Cuttings and embankments stable; no slips, rock falls or sinkholesPhoto
    • Bridges, culverts and tunnels show no visible structural damage
    • Structure clearances unobstructed

    Lineside and level crossings

    • Trackside indicators and speed boards present and legible
    • Level crossing warning equipment, road surface and signs in order
    • Vegetation clear of the track, signals and sightlines
    • Fencing intact; no encroachment or trespass paths
    • No theft or vandalism of rail, fastenings, cables or overhead traction equipmentPhoto

    Defects and protection

    • Every defect recorded with its km point and its precursor category
    • Speed restriction or protection in place where a defect needs it, with the boards placedPhoto
    • Defects reported to the track maintenance supervisor the same shift

    How to use this checklist

    1. 1Walk or trolley the length set for today, one sheet per section, and write the km from and to in the header.
    2. 2Look at the rail and joints, sleepers and ballast, geometry, points and crossings, drainage and structures, and the lineside, in that order.
    3. 3Mark every item OK, Defect or N/A. For each defect, write the km point, what you saw and its precursor category (rail break, kick-out, geometry, gauge widening, washaway, points and crossings) in the defects table, and photograph it.
    4. 4Where a defect makes the line unsafe at line speed, put the speed restriction or protection your rules require in place before you move on, and photograph the boards.
    5. 5Report the defects to the track maintenance supervisor the same shift, and close each one in the table when the repair is done and checked.

    A general guide. Your track maintenance plan and the network's own standards set the limits and the inspection interval; add them to the form. In South Africa the Railway Safety Act, 30 of 2024 replaced the National Railway Safety Regulator Act, 16 of 2002, and SANS 3000-2-2 covers track and civil infrastructure. The defect topics follow category 1, track and civil infrastructure, of the precursors and leading indicators in Table 3 of the draft Regulations regarding Railway Occurrences to be Reported to the Railway Safety Regulator, 2026 (GN 7765 of 31 July 2026), which operators would report quarterly, and the theft topics follow category 1 of its Table 2. The regulations were published for comment and are not yet final.

    Legal basis checked on against: Draft Regulations regarding Railway Occurrences to be Reported to the Railway Safety Regulator, 2026 (GN 7765 of 31 July 2026), Tables 2 and 3.

    Convert this checklist into a digital form

    Run it on an Android phone with no signal, attach photos as evidence, and every failed item raises an issue with an owner and a due date.

    Start the trial from here and this checklist is waiting in your workspace as a ready-made form.

    Paper finds the defect. Then what?

    On paper, a ticked "Defect" box often stays a ticked box. In Inspecable the same checklist keeps going after it is signed:

    • Run the checklist on an Android phone with no signal; it syncs when the crew is back in range.
    • A failed item raises an issue with an owner and a due date.
    • A corrective action cannot close without evidence and a signature.
    • Every completed inspection produces a signed PDF with its photos.

    Questions

    How often should railway track be inspected?

    As often as the network's track maintenance plan sets, based on line speed, traffic and condition; no South African regulation we have checked fixes an interval. As a benchmark, US federal rules (49 CFR 213.233) require most main track to be inspected at least weekly, and twice weekly on faster or busier lines.

    Which track defects are reported to the Railway Safety Regulator?

    Derailments, collisions and other occurrences are reported as they happen. Under the 2026 draft occurrence regulations, track and civil precursors are reported quarterly as leading indicators: rail breaks, kick-outs, geometry faults, gauge widening, washaways, defective points and crossings, structural and slope failures, and missing trackside indicators.

    Who may carry out a track inspection?

    A track inspector or patroller the operator has assessed as competent for that class of line, under its safety management system. The inspector needs the authority to put a speed restriction or protection in place when a defect makes the line unsafe.

    Get the free printable PDF